Whitmer rethinks Line 5 tunnel permits, ramps up shutdown pleas after court ruling

Whitmer rethinks Line 5 tunnel permits, ramps up shutdown pleas after court ruling

In a letter to the CEO of Enbridge Energy, the Michigan governor questioned whether the Line 5 tunnel will ever be built and called it ‘untenable’ for the company to keep pumping oil through the Straits.

Original Source

Read the full article at Bridgemi →

KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.