Published Nov 27, 2026, 6:45 PM EST Paul has had a career of 25+ years focused on the international technology sector, which has taken him to over 100 countries. Along the way, he developed a deep love for aviation, with a travel bucket list measured by aircraft types flown rather than destinations reached. Now he brings that avgeek passion, along with the journalism experience he accumulated early in his career, to write insightful pieces for Simple Flying. A group of 24 Democratic lawmakers has criticized the Federal Aviation Administration (FAA) for prematurely deploying a new artificial intelligence (AI) tool across US airspace. In a letter to FAA Administrator Bryan Bedford on Tuesday, November 24, the lawmakers accused the agency of expanding a largely untested system nationwide before completing its promised 90-day validation period. The nationwide deployment of the Strategic Management of Airspace, Routes, and Trajectories (SMART) system came just three days before a telecommunications failure brought US departures to a standstill. While the FAA has denied any connection between the two events, the controversy raises fresh questions about whether the Trump administration's ambitious air traffic control (ATC) modernization program is prioritizing the speed of implementation over adequate testing, safety oversight, and transparency. FAA Accused Of Rushing Nationwide AI Rollout Credit: Juan Pabloms | Shutterstock Led by House Transportation and Infrastructure Committee Ranking Member Rick Larsen, the lawmakers allege that the FAA expanded the SMART system nationwide without advance notification to Congress. The expansion came just 50 days after its initial deployment in the Washington area, despite the FAA previously outlining a 90-day validation period. In their letter to Bedford, the lawmakers expressed frustration with the lack of supporting safety data, stating: “We have yet to receive any substantive information proving the system was properly validated before its nationwide expansion.” Concerns surrounding SMART considerably predate the nationwide grounding. In September, the National Air Traffic Controllers Association (NATCA) told Flying that it had been excluded from the system's development, testing, and implementation. Lawmakers subsequently requested that the FAA suspend SMART operations and called for an independent Government Accountability Office (GAO) audit. More troublingly, the latest letter cites allegations that FAA employees who raised safety concerns about SMART's accelerated deployment may have faced retaliation. Date Development June 2026 FAA awards $875 million SMART contract September 18 Airline industry concerns emerge September 21 SMART launches at three Washington-area airports September 22 NATCA's exclusion from development and testing is reported October 9 Lawmakers request suspension of SMART operations October 2026 Congressional request for an independent GAO audit November 10 SMART expands to all 22 enroute control centers November 13 Nationwide ground stop November 24 24 House Democrats demand answers from FAA November 30 Deadline for FAA response December 1–2 FAA and DOT officials scheduled to testify before Congress The lawmakers have presented the FAA with 13 questions, demanding details of its safety assessments, performance metrics, controller training, cybersecurity protections, and contingency plans should SMART experience an outage. They also question why the agency prioritized deploying SMART over essential infrastructure upgrades, including radar replacements. Reuters reports that the FAA has declined to publicly address the allegations, indicating that it will respond directly to lawmakers. Credit: Denver International Airport Developed by Air Space Intelligence (ASI) under an $875 million, 12-year contract, SMART is designed to make the increasingly congested US airspace more efficient. The cloud-based technology consolidates approximately 200 data streams, encompassing weather forecasts, flight trajectories, airport capacity, and controller staffing. Its predictive capabilities allow aviation professionals to anticipate operational bottlenecks and identify alternative flight paths before disruptions materialize. Importantly, SMART does not autonomously direct aircraft. FAA specialists at a dedicated center in Washington review its recommendations before forwarding them to the agency's Air Traffic Control System Command Center in Warrenton, Virginia. Human controllers retain ultimate operational authority. The technology has similarities with ASI's Flyways AI platform, which Alaska Airlines began using in 2021 to assist flight dispatchers in optimizing aircraft routing. FAA SMART System Details Contract value $875 million Contract duration 12 years Integrated data streams Approximately 200 Initial airports covered 3 Planned validation period 90 days Time before nationwide expansion 50 days En-route control centers covered 22 Flights rerouted during initial rollout 180 Average time saved per rerouted flight 10 minutes Average fuel saved per rerouted flight Nearly 80 gallons The potential commercial benefits are substantial, and United Airlines, Delta Air Lines, American Airlines, and Southwest Airlines have all expressed support for the initiative. According to the FAA, and as reported by Aerotime, SMART's initial deployment delivered measurable efficiency improvements, potentially translating into considerable fuel savings and fewer passenger disruptions when replicated nationally. However, lawmakers argue that evidence of improved operational efficiency cannot substitute for comprehensive safety validation. Nationwide Grounding Exposes Challenges Of FAA Modernization Credit: Gorodonkoff | Shutterstock The concerns come amid the shock of the November 13 nationwide ground stop, which demonstrated the vulnerability of America's existing ATC infrastructure. The FAA's preliminary investigation identified a telecommunications failure, with excessive data traffic overwhelming legacy equipment following routine maintenance work. The resulting instability affected communications and radar feeds across much of the country. Both the FAA and ASI have explicitly denied that SMART contributed to the disruption. November 13 Nationwide Ground Stop Impact Ground stop duration 4 hours, 45 minutes En-route control centers affected 17 of 22 Airborne aircraft safely landed Approximately 3,500 Total flight cancellations on November 13 12,462 Cancellations across the wider disruption More than 18,000 Estimated passengers affected 1.5 million The incident was the first nationwide ground stop since the January 2023 failure of the FAA's NOTAM system. A September 2026 GAO report highlighted significant shortcomings in the FAA's modernization cost estimates and scheduling. Previous research found that 105 of the agency's 138 ATC systems were either unsustainable or potentially unsustainable, illustrating the urgency of replacing aging infrastructure while maintaining the integrity of existing operations. Congressional scrutiny is set to intensify next week, with Bedford expected to appear before a House panel on December 1 and Transportation Secretary Sean Duffy scheduled to testify before the Senate on December 2. Duffy's request for approximately $50 billion in additional aviation infrastructure funding, including $600 million for strategic traffic flow management technologies such as SMART, already faces significant opposition. Securing that funding may increasingly depend on the FAA demonstrating that its accelerated modernization efforts are not compromising safety.
Lawmakers Criticize FAA Deploying New “Untested” AI Tool Days Before Nationwide Grounding
Full Article
Original Source
Read the full article at Simpleflying →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.